Do I have to have a Maryland licensed professional prepare, sign, seal and date, drawings and specifications for commercial residential and industrial permit application?

Yes, for Land Surveyors, Engineers and Architects, however there are a few exceptions to the need for a professional Architect. They are as follows:

  1. A developer, builder, or contractor to provide design services related to the developer’s, builder’s, or contractor’s own construction of new or existing single-family or two-family dwellings, or structures ancillary to them, or farm buildings.
  2. An individual to prepare plans, drawings, and other documents in connection with the addition, alteration, construction, design, or repair of a single-family dwelling and appurtenances that are for the personal use of that individual or a member of the immediate family of that individual.
  3. A person may not be required to employ a licensed architect in connection with the alteration or repair of an existing building or structure in a municipal corporation if the alteration or repair:
    • Does not exceed $5,000 in estimated costs, including labor and materials
    • Is limited to:
      • Fixtures, cabinetwork or furniture
      • Interior alterations or repairs
      • Storefronts or facades
    • Does not adversely affect the structural system of the building, including:
      • Beams
      • Bearing partitions
      • Columns
      • Floors
      • Footings
      • Foundations
      • Joists
      • Mechanical, electrical, or plumbing systems
      • Roofs
      • Walls

Show All Answers

1. What code does the Town of Easton Use?
2. How long is the plan review process from initial application?
3. How could I expedite my commercial, residential or industrial applications processing time?
4. How could I calculate my building permit fees?
5. Do I need to make application for mechanical, plumbing or electrical installations with the Town of Easton?
6. What codes are used for existing buildings undergoing repairs, alterations and/or additions?
7. What do I have to do if the tenant of my building changes?
8. Do I have to have a Maryland licensed professional prepare, sign, seal and date, drawings and specifications for commercial residential and industrial permit application?
9. Do I have to submit a MECcheck or COMcheck to certify compliance with the International Energy Conservation Code?